Here is a schedule I created for Edale; it's very bland because, having not been to Edale previously, I am not sure how long it will take to walk to suitable locations. I would have preferred to do a location scout to find locations and to see how far everything is/the general area. Unfortunately, I was unable to do this but it has taught me to make sure I do one in future as it has also been difficult to draw up the storyboard with no idea of the look of locations other than the few pictures available on google. I also would like to have been a bit more in-depth by separating shots into the schedule but I feel that the detail needed to do this was not available - for example, not enough knowledge of location.
DAY | CALL | TIME | TIME | LOCATION | CAST | TRANSPORT | ART DEPT PROPS | SOUND |
| TIME | SET UP | START | SCENE NUMBER | | & EQUIPMENT | | CONSIDERATIONS |
| TRAVEL | ART DEPT | SHOOTING | FULL OR SPLIT SCENE | | REQUIREMENTS | | |
| TIME | WARDROBE | | | | | | |
| | LIGHTS | | | | | | |
| | | | | | | | |
Thursday 27th October | Call time 09:45am | 11:00 - briefing | 11:30 | Edale - Grindersbrook walk | None | Train | None, pebble will be on site | None - silent film |
| Leaving 10:14am | 11:15am -find locations | | | | | | |
| | | | | | | | |
|
No comments:
Post a Comment